As a green energy scheme, sustainability and environmental impact were central to the planning and construction approach at every stage.
Bespoke solution for new hydroelectric development
Heap Bridge, Bury
Project Overview
| Location |
|
|---|---|
| Sector | Water Power & Energy |
| Products |
The River Roch in Bury, Lancashire, has a huge natural weir. This weir is next to a large industrial park, with many businesses and heavy energy usage.
A feasibility study delivered a solution to use the weirs natural resources to feed the estate. After extensive ecological surveys, the project was given the go ahead. The plan was to build a reverse turbine hydroelectric power plant.
Our solution
By working closely with the contractor and the project consultants Hallidays, we were able to understand the challenges and use our experience to create a cost effective plan.
Our design team were instrumental in early site visits to resolve the three main areas:
- How to install temporary works to allow construction alterations to the existing structure
- How to provide a formwork design to allow the new structure to be built and incorporate part of the old foundation structure
- The final removal of the temporary works, as part of the project was in a fast flowing river bed with many environmental considerations
As we have national teams, the design, depot and technical sales team were all local to the project. This made support for revisions and site visits, which were crucial to this project a lot quicker and easier for the customer.
Re-engineering of the old structure into modern integrated CAD drawings was necessary by our design team, as the original structure had no drawings due to its age.
Many alternatives for the scheme were discussed, but our panel formwork system, Frami, was the best solution due to its flexibility. This enabled us to adapt a flexible, modular system to create a bespoke solution.
Get in touchProject images
Related news and projects
- Project
- Kirkthorpe, Wakefield
Helping development of Yorkshire’s largest hydroelectric scheme
- Project
- Derbyshire Waste Plant, Derby
Digital engineering expertise brings waste facility project to life
- Project
- Battersea Power Station, London
Basement construction at large new development
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
[email protected]